04 / Industrial structures

Industrial Hall & Warehouse

Configure the envelope. Resolve the structure.

Drag / orbit · Shift / pan · Wheel / zoom
Live spatial preview
STRUCTURE / LIVEINDUSTRIAL HALL5 FRAMES

A parametric industrial-building system that coordinates portal frames, secondary steel, cladding and access geometry in one responsive spatial model.

Launch full configurator
Shared platform DNA

Six forces.
One product state.

Every deployment is built on the same connected commercial and spatial foundation—even as the product category changes.

XY
01ACTIVE FACE

Bill of Materials

The approved visual state resolves into an exact component structure: profiles, panels, glass, hardware, accessories and quantities ready for downstream work.

Signal pathGeometry → components
System overview

Configure the envelope. Resolve the structure.

A parametric industrial-building system that coordinates portal frames, secondary steel, cladding and access geometry in one responsive spatial model.

Capabilities / 06

What the system resolves.

01

Parametric building envelope

Length, span, eaves height and roof pitch rebuild the complete industrial volume while maintaining a coherent portal-frame system, ridge geometry and usable internal clearance.

02

Engineered frame spacing

A target bay spacing resolves automatically into a practical frame count and actual equal bay spacing, keeping the structural rhythm synchronized with the building length.

03

Structure duty presets

Switch between light, standard and heavy structural presets to communicate how primary sections, visual weight and the intended operational duty change together.

04

Access geometry

Configure the roller-door width and height inside the available façade, with the opening remaining constrained by the hall span and eaves height.

05

Layer visibility

Toggle cladding and secondary members independently to move from the finished envelope to the structural logic beneath it without loading a separate technical model.

06

Exploded assembly

Separate envelope, secondary steel and primary portal frames into a legible construction sequence, then return to the coordinated assembled building in one interaction.

Resolved state

From visual decision
to usable output.

  1. 01Configured geometry
  2. 02Frame schedule
  3. 03Envelope quantities
  4. 04Access specification
Full deployment

Explore every rule.
Configure the real system.

Open live configurator